QUESTION 11

Retrieving inbound delivery schedules for a scheduling agreement takes a very long time. What do you identify as possible reason for the low performance?

 

A.

The scheduling agreement has different items.

B.

The inbound delivery schedules are checked by ATP.

C.

The inbound delivery schedules have many items.

D.

The scheduling agreement still refers to a previously rejected scheduling agreement.

 

Answer: A

 

 

QUESTION 12

Your customer is using their own modified condition tables with a large number of condition records. How can you improve the performance of the pricing procedure?

 

A.

Optimize the access sequence with special requirements.

B.

Buffer the condition table within a modification to reduce the number of accesses.

C.

Use standard formulas to optimize the pricing procedure process.

D.

Split the condition into two by using a customer exit to make the tables smaller.

 

Answer: B

 

 

QUESTION 13

 

The customer wants to implement an inter-company process. Which changes are required? (Choose three)

 

A.

Create a new condition record for the delivering sales organization.

B.

Extend the material master with the delivering sales organization and delivery plant.

C.

Assign the ship-to-party to the delivering sales organization.

D.

Assign the sold-to-party to the delivering sales organization.

E.

Create new scheduling agreements in the delivering sales organization.

 

Answer: ABC

 

 

QUESTION 14

What are advantages of transaction variants?

 

A.

They enable system client specific screen variants.

B.

They provide a screen sequence control.

C.

They require new transaction codes for standard variants.

D.

They can help to simplify the complexity of screens and transactions.

 

Answer: D

 

 

QUESTION 15

How do you ensure consistency of number ranges in SAP ERP for documents that are uploaded from handhelds?

 

A.

Set up RFC connections between handhelds and the SAP ERP system.

B.

Use the middleware to determine the correct number range.

C.

Implement a system modification to determine a separate number range.

D.

Use a function module from a user exit to identify the origin of the documents.

 

Answer: D

 

 

QUESTION 16

What differentiates consumption based planned and demand-driven planned material?

 

 

 

 

 

A.

For consumption based planned material, the whole order quantity is always confirmed.

B.

For demand-driven planned material, the whole order quantity is always confirmed.

C.

For consumption based planned material, a production order is always created.

D.

For demand-driven planned material, a production order is always created.

 

Answer: A

 

 

QUESTION 17

Some orders are processed with wrong tax values. What relevant indicators should you check?

 

A.

Check the indicators for the customer and the material to evaluate if they lead to the correct value determination.

B.

Check the indicators for the customer destination and the VAT document type to find out if they are assigned to the correct output determination.

C.

Check the indicators for the position type and the address of the ship-to-party to find out if the assigned country is correctly determined.

D.

Check the indicators for the condition type and the freight carrier address to find out if the scale basis for the condition type is correctly determined.

 

Answer: A

 

 

QUESTION 18

Which object do you use to switch on the ATP check?

 

A.

Requirement class

B.

Checking rule

C.

Requirement type

D.

Strategy group

 

Answer: A

 

 

QUESTION 19

A company is going to enhance their standard transportation functions in SAP ERP with an external transportation planning system. What is mandatory for the setup?

 

 

 

 

 

A.

The transportation planning point determination is set up based on shipping type and shipping point.

B.

One transportation planning point is assigned to exactly one planning system.

C.

One planning system is assigned to exactly one transportation planning point.

D.

The transportation planning point determination is set up based on shipping type and shipping condition.

 

Answer: B

 

 

QUESTION 20

A customer uses make-to-order production with assembly processing. How do you schedule a sales order when components are already produced and procured?

 

A.

Create a production order directly from the sales order.

B.

Use a planning run to generate a planning order for the sales order.

C.

Explode the bill of material and plan dependent demands for the sales order.

D.

Use heuristic planning for material reservation of the sales order.

 

Answer: A