650-474 Real Tests (Spring 2015)

Download New Updated (Spring 2015) Cisco 650-474 Actual Tests 11-20

By on April 28, 2015
Ensurepass  QUESTION 11 In the Cisco ISE ATP program, what must the sales team submit to begin the sales process?   A. a new product-hold waiver B. high-level and low-level designs C. a preliminary design and a request for equipment release D. a high-level design and BoM   Correct Answer: B     QUESTION 12 When determining the number of endpoints for a user base, what is a good ratio for a starting point?   A. 1-to-l B. 2-to-l C. 3-to-l D. Read more [...]

Continue Reading

650-474 Real Tests (Spring 2015)

Download New Updated (Spring 2015) Cisco 650-474 Actual Tests 21-25

By on
Ensurepass  QUESTION 21 What is the maximum number of endpoints supported on 3315/3355/3395 providing all Cisco BE services respectively?   A. 5000/1000/50000 B. 3000/6000/10000 C. 2000/4000/8000 D. 1000/2000/5000 E. 4000/8000/15000   Correct Answer: B     QUESTION 22 Which statement is true?   A. A Cisco ISE Advanced license is perpetual in nature. B. A Cisco ISE Advanced license can be installed on top of a Base and/or Wireless license. C. Read more [...]

Continue Reading

650-474 Real Tests (Spring 2015)

Download New Updated (Spring 2015) Cisco 650-474 Actual Tests 1-10

By on
Ensurepass  QUESTION 1 Which statement about Cisco Identity Services Engene high availability is true?   A. Monitoring nodes are deployed m an active/active mode. One node serves as primary. All logs are sent automatically to both HA monitoring nodes. B. Administration nodes are limited to two and are deployed in an active/standby mode. C. Secondary Administrate node automatically becomes primary in the event of primary node failure. D. Monitoring nodes are deployed in an Read more [...]

Continue Reading