Latest Certified Success Dumps Download

CISCO, MICROSOFT, COMPTIA, HP, IBM, ORACLE, VMWARE
JK0-017 Latest Exam (Sep 2017)

[Free] 2017(Sep) EnsurePass Braindumps CompTIA JK0-017 Dumps with VCE and PDF 11-20

September 18, 2017

EnsurePass
2017 Sep CompTIA Official New Released JK0-017
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/JK0-017.html

CompTIA E2C Project Certification Exam

Question No: 11 – (Topic 1)

In order to obtain the best pricing and product quality, a project manager should:

  1. obtain an RFP from one vendor who can provide the products.

  2. obtain an RFP from the vendor who provides the lowest priced products.

  3. obtain responses from different vendors to compare the products.

  4. use past vendors who have provided all project deliverables.

Answer: C

Question No: 12 – (Topic 1)

A project manager has decided to increase the number of resources working on critical path activities. This is an example of:

  1. rolling wave planning.

  2. resource leveling.

  3. fast tracking.

  4. crashing.

Answer: D

Question No: 13 – (Topic 1)

Which of the following may have a significant adverse impact upon the successful completion of an international project? (Select Three).

  1. Time zones

  2. Travel costs

  3. Co-location of resources

  4. The project plan

  5. Scheduled vacations

  6. Language barriers

Answer: A,B,F

Question No: 14 – (Topic 1)

A project manager is presented with a change request for an ongoing project. Which of the following would be the FIRST action?

  1. Update the project plan to accommodate the changes.

  2. Perform an impact analysis.

  3. Organize a stakeholder meeting to review the changes.

  4. Change the project scope to reflect the change request.

Answer: B

Question No: 15 – (Topic 1)

Which of the following are created using information contained in the work breakdown structure (WBS)? (Select Two).

  1. Project scope statement

  2. Project statement of work

  3. Project charter

  4. Project activity estimates

  5. Project resource estimates

Answer: D,E

Question No: 16 – (Topic 1)

Which of the following steps should a project manager take to ensure the quality of project deliverables for a customer? (Select Two).

  1. The project manager should consult the project sponsor and customer to review the current quality requirements.

  2. The project manager should request a peer review of the project to determine if it meets the customers quality standards.

  3. The project manager should change the scope of the project to meet the customers expectations of quality standards.

  4. The project manager should check the finished product to determine if it meets the customers quality standards.

  5. The project manager should outsource to obtain the best resources for the project.

Answer: B,D

Question No: 17 – (Topic 1)

A product has been sent to an outside vendor for testing. During their testing it was determined that the product is not meeting the quality standards. The project manager scheduled a meeting to review their findings. Which of the following BEST describes this situation?

  1. Quality assurance

  2. Quality control

  3. Quality analysis

  4. Quality planning

Answer: B

Question No: 18 – (Topic 1)

The project manager crashes a project that is behind schedule and under-budget. Which of the following will be the intended result?

  1. The project will be behind schedule and over-budget.

  2. The project will be on schedule but over-budget.

  3. The project will be on schedule and on-budget.

  4. The project will be behind schedule and on-budget.

Answer: C

Question No: 19 – (Topic 1)

Which of the following methods would a project manager use to estimate the construction cost of a 2,000 square foot home when given the cost per square foot?

  1. Parametric estimating

  2. Analogous estimating

  3. Top-down estimating

  4. Bottom-up estimating

Answer: A

Question No: 20 – (Topic 1)

A project manager is performing activity sequencing using the arrow diagramming method (ADM). Which of the following is true of ADM?

  1. ADM can only represent finish to start dependencies.

  2. ADM cannot represent multiple successor activities.

  3. ADM can only represent activities that are on the critical path.

  4. ADM uses boxes representing activities, and arrows to represent dependencies.

Answer: A

100% Free Download!
Download Free Demo:JK0-017 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass JK0-017 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE