CompTIA Server

Question No: 41

A system administrator has determined thatmore storageis needed for company data. The storage requires thehighest speed data transfer rate with maximum performance. Which of the following solutions MUSTbe implemented to meet the business requirements?

  1. FC SAN

  2. FCoE

  3. iSCSI

  4. JBOD

Answer: A

Question No: 42

Two servers are to be configured for high availability in a cluster. Both servers will be running applications at the same time. This feature is know as:

  1. round robin.

  2. heartbeat.

  3. active/active.

  4. active/passive.

Answer: C

Question No: 43

A technician has completed the installation and configuration of a third email server. The technician has configured the firewall to permit email traffic, but the mail is only being received by the two older servers. Which of the following should the technician configure to ensure incoming email will be processed by all three servers?

  1. Enable NTP to ensure all three servers are synchronized.

  2. Configure IMAP on the new mail server.

  3. Add the DNS server option in DHCP.

  4. Update the MX record in DNS.

Answer: D

Question No: 44

A hardware failure affects a server in adatacenter. The server is critical to company operation, and the hardware vendor is out of stock on the parts needed to repairthe server. A network technician suggests replacing it with a server from the warm site.Which of the

following should the technician do FIRST?

  1. Outsource a hardware-certified courier to move the server to the datacenter.

  2. Check the DRP and BCP and talk to the company stakeholders before making the decision.

  3. Unrack the server from the warm site and move it to the datacenter.

  4. Order the parts from the hardware vendor and notify affected users that the server will be down.

Answer: B

Question No: 45

A line-of-business software patch notification is received. The notification indicates that version 5.0 of the software has new features that the accounting department has been expecting.The update requires a new version of the OS and new version of SQL on the server. Which of the following should the administrator performFIRST?

  1. Schedule downtime to update the OS and SQL on the server.

  2. Download and test the new version.

  3. Develop a plan to build a test server.

  4. Request feedback from the accounting department.

Answer: C

Question No: 46

A server administrator is researching the purchase of SSD for a server. The administrator receives a report from the datacenter technician detailing current storage requirements and future growth planning estimates as follows:

ServerA: Current-15TB-Future-50% growth ServerB: Current-20TB-Future-80% growth

Based on this report, which of the following represents the MINIMUM storage requirements needed?

  1. ServerA-18TB, ServerB-24TB

  2. ServerA-22TB, ServerB-22TB

  3. ServerA-23TB, ServerB-36TB

  4. ServerA-25TB, ServerB-40TB

Answer: C

Question No: 47

Which of the following is the purpose of an NTP server?

  1. For hosting instant messaging applications

  2. For synchronizing clocks on network devices

  3. For file sharing and collaboration

  4. For hosting newsgroups

Answer: B

Question No: 48

A technician is tasked with building a test server. Which of the following hard drive types will provide the highest performance?

  1. SCSI

  2. SAS

  3. SATA

  4. iSCSI

Answer: B

Question No: 49

A technician working in the datacenter has finished racking a new 4U server into a new rack. Which of the following should the technician do to allow for hot/cold aisle containment?

  1. Close the perforated floor tile in front of the new rack.

  2. Reset the rack temperature and humidity control.

  3. Install blanking panels in the rack.

  4. Lower the temperature of the data center HVAC.

Answer: C

Question No: 50

Which of the following is a reason to have a remote cold site readily available in case of a disaster in the primary datacenter?

  1. It provides a company with a redundant location that mirrors the primary datacenter hardware but requires no data restoration.

  2. It provides a company with a backup location to install the necessary equipment to restore critical services.

  3. It provides a company with a backup location equipped with resources necessary for immediate restoration of critical services.

  4. It provides a company with a redundant location that mirrors the primary datacenter hardware and data.

Answer: B

100% Free Download!
Download Free Demo:SK0-004 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass SK0-004 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE