Question No: 101 – (Topic 2)

Which of these tasks is associated with Project Planning?

  1. Identify customer and partner stakeholders, define technical escalation procedures, review communications plan, identify risks and mitigation plan

  2. Explain Customer Responsibilities with support model, Conduct an Engagement Profitability assessment, Assemble WLAN system components in staging area

  3. Verify site remediation plan execution, integrate WLAN authentication into overall security architecture, compile As-Built Documentation

  4. Verify and Track Site-Specific BOM Procurement Guidelines, Rack and stack WLAN controllers, integrate with Third-party applications

  5. Understand how customers measures ROI, identify Key Stakeholders and Business Owners

Answer: A

Question No: 102 – (Topic 2)

Which of these activities comprises the service component of WLAN site Readiness

Assessment (RF Survey)?

  1. Perform Automated scan of Ports to determine potential vulnerabilities; produce network map of devices, operating system and services being offered to the network research and confirm registration of target IP address space.

  2. Execute a Series of system performance analyses to provide a holistic view of the converged network of the customer, perform an infrastructure audit, complete security review of WLAN infrastructure

  3. Collect and Verify Information About Current Operations support infrastructure, identify customer support for WLAN analyze customer operational infrastructure

  4. Conduct Customer Site survey, Perform Site Gap analysis, Develop site requirements specification Report, Gather and Verify Customer Network Information, Perform Gap Analysis

Answer: D

Question No: 103 – (Topic 2)

Which of these best describes what happens in the design phase?

  1. The new WLAN solution is installed in the customer network while minimizing disruptions and potential vulnerabilities

  2. The business and technical requirements of the customer are analyzed and evaluated to identify products or solutions that best meet the customer needs

  3. A detailed design for the WLAN solution is developed, ensuring that the solution meets the customer business requirements while attempting to anticipate and prevent potential network bottlenecks and failures

  4. The current network, staff and processes of the customer are assessed and tested to determine if the proposed WLAN solution can be supported

  5. A newly implemented WLAN solution operates efficiently, has high availability and meets customer expectations for performance and reliability

Answer: C

Question No: 104 – (Topic 2)

Which three of these activities occur in the problem management service component of the operate phase? (Choose three.)

  1. Conduct Post-Change Evaluations

  2. Classify Groups of Known Incidents as a problem

  3. Provide Hardware and Software support to Resolve Incidents

  4. Document Any issues encountered during software upgrade, as well as methods used to resolve the issues

  5. Recover From incident outage

  6. Track Events and Report on System Availability, Resource Capacity and performance

Answer: B,C,D

Question No: 105 – (Topic 2)

Which service component within the prepare phase helps to increase the changes that the proposed system will meet the customer requirements and expectations?

  1. WLAN Wired Network Integration Assessment

  2. Technology Strategy Development

  3. Proof of Concept

  4. Business Requirements Development

  5. Business Case Development

  6. High Level Design Development

Answer: C Explanation:

Topic3,More Practice(70 Questions)

Use these questions to reinforce exam concepts.

Question No: 106 – (Topic 2)

What are the benefits for a customer with a WLAN infrastructure if their Cisco partner does professional migration planning?

  1. reduced need for administration and paperwork

  2. accelerated adoption of WLAN and avoidance of network disruptions

  3. reduced effort to produce a fallback plan

  4. reduced cost of the overall project

  5. shorter project duration

Answer: B

Question No: 107 – (Topic 2)

Which of these is a key deliverable in the design phase?

  1. Business Requirements Document, Preliminary Discovery Document, Technology Requirements Document, Financial Analysis and Business Case

  2. As-Built Solution Binder, Operations Support Plan Report, Change Management Status Report

  3. Escalation Plan, Communications Plan, Staff Training Plan

  4. Low Level Design, Staging Plan, Operations Plan, Migration Plan

  5. WLAN Site Readiness Assessment Report, Voice over WLAN Assessment Report, Operations Readiness

Assessment Report

Answer: D

Question No: 108 – (Topic 2)

The first activity in the service component of Planning Project Kickoff in the plan phase is quot;project management through PDI phases of deploymentquot;. Which one of these groups of tasks are associated with the Planning Project Kickoff service component?

  1. Develop comprehensive project management plan, including detailed set of deployment tasks, roles and responsibilities, work breakdown structure, project schedule, costs, budget, risk management, and communication plan.

    Manage project lifecycle.

  2. Interview sponsors to review project parameters model, success metrics, objectives, and timeframes. Propose and gain agreement on governance model to communicate with key sponsors.

  3. Review program delivery document and assign project manager; identify project sponsors from the vendor, customer, and partner.

  4. Confirm project and milestone dates; project roles and responsibilities, sites, and logistics.

Answer: A

Question No: 109 – (Topic 2)

Which of these best describes what happens in the design phase?

  1. The business and technical requirements of the customer are analyzed and evaluated to identify products or solutions that best meet the customer needs.

  2. The current network, staff, and processes of the customer are assessed and tested to determine if the proposed WLAN solution can be supported.

  3. The new WLAN solution is installed in the customer network while minimizing disruptions and potential vulnerabilities.

  4. A newly implemented WLAN solution operates efficiently, has high availability, and meets customer expectations for performance and reliability.

  5. A detailed design for the WLAN solution is developed, ensuring that the solution meets the customer business requirements while attempting to anticipate and prevent potential network bottlenecks and failures.

Answer: E

Question No: 110 – (Topic 2)

Which of these best describes the structure of Cisco Lifecycle Services? (Choose the best answer.)

  1. Phases, Services, Tasks, Tools, and References

  2. Solution Strategies, Service Levels, Activities, and Tasks

  3. Service Components, Activities, Tasks, and Subtasks

  4. Phases, Service Components, Activities, Tasks, Templates, Tools, and Reference Materials

  5. Service Activities, Tools, Solutions, Components

Answer: D

100% Free Download!
Download Free Demo:650-621 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass 650-621 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE