Latest Certified Success Dumps Download

CISCO, MICROSOFT, COMPTIA, HP, IBM, ORACLE, VMWARE
650-621 Latest Exam (Sep 2017)

[Free] 2017(Sep) EnsurePass Testking Cisco 650-621 Dumps with VCE and PDF 71-80

September 7, 2017

EnsurePass
2017 Sep Cisco Official New Released 650-621
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/650-621.html

Lifecycle Services for Advanced Wireless LAN (LCSAWLAN)

Question No: 71 – (Topic 2)

Informal basic training is conducted for helpdesk, admin, operations staff and end users. Which two templates will help to accomplish this task? (Choose two.)

  1. Network Ready for Use Template

  2. WLAN Assessment Report

  3. End User Training Template

  4. Executive Interview Template

  5. Staff training Template

  6. Change Management Process Template

Answer: C,E

Question No: 72 – (Topic 2)

Which of these service components are part of the plan phase?

  1. WLAN Tuning assessment

  2. WLAN performance and troubleshooting assessment

  3. WLAN location-based services assessment

  4. Voice Over WLAN assessment

  5. WLAN site readiness assessment (RF survey)

  6. Migration plan development

Answer: C,D,E

Question No: 73 – (Topic 2)

Which one of these choices consists of a task or tasks included in the system migration service component of the implement phase?

  1. Verify that escalation path is in place for difficulties with test cases

  2. Define Requirements for Monitoring Service Level Measurements

  3. Determine Project schedule, Develop Resource Plan, Establish Project Budget

  4. Confirm Project milestones and cutover Roles and Responsibilities

  5. Assess implementation readiness at each site, define timelines for Post-Implementation Testing, Execute Contingency Plans as required

Answer: E

Question No: 74 – (Topic 2)

Which document is a prerequisite to developing successfully migration plan?

  1. Proof of Concept Report

  2. High Level Design

  3. Business Plan

  4. Low Level Design

  5. System Readiness Report

Answer: D

Question No: 75 – (Topic 2)

Which of these service components occur in the design phase?

  1. WLAN wired Network Integration Assessment, WLAN location-based service assessment, security Architecture Assessment

  2. Detailed Design Validation, Operation Plan, System Acceptance Test Plan Development

  3. System Calibration, Project Planning Staff Training

  4. High Level Design Development, proof of concept, Business Requirements Development

Answer: B

Question No: 76 – (Topic 2)

Consider these activities: quot;Security review of the WLAN infrastructurequot;, quot;Performing an infrastructure auditquot;, and quot;Creating a performance baseline and executing a series of system performance analyses to provide a holistic view of the converged network of the customerquot;. Which one of these service components involves these activities?

  1. Operations Assessment

  2. Security Administration

  3. Security Assessment

  4. Technology Assessment

  5. Business Case Alignment

Answer: D

Question No: 77 – (Topic 2)

Which three tasks in the implement phase are contained in the IPC project Plan Template? (Choose three.)

  1. Define and Document Project Scope

  2. Identify Risks and Risk Mitigation Plans

  3. Determine Vertical Approach and Strategy

  4. Log Network Events

  5. Develop Backup/Recovery Plan

  6. Determine Project Schedule

Answer: A,B,F

Question No: 78 – (Topic 2)

What are the benefits for a customer with a WLAN infrastructure if their Cisco Partner does Professional Migration Planning?

  1. Shorter project duration

  2. Reduced cost of the overall project

  3. Reduced effort to produce a fallback plan

  4. Reduced need for administration and paperwork

  5. Accelerated adoption of WLAN and avoidance of network disruptions

Answer: E

Question No: 79 – (Topic 2)

Producing a technology assessment report involves which of these tasks?

  1. Compare customer processes with operational leading practices for WLAN and identify Gaps

  2. Review System Component Configurations to verify that they meet customer performance, capacity, traffic, quality of service and resiliency guidelines

  3. Establish Escalation Notification

  4. Determine Security Procedures and Policy Gaps

  5. Collect Performance, Utilization and availability data for reporting

Answer: B

Question No: 80 – (Topic 2)

Which two of these are outputs from the technology assessment service component? (Choose two.)

  1. As-Built Solution Binder

  2. Create a System Baseline by running performance, capacity, traffic, QoS and Resiliency Reports

  3. Incident Identification and Resolution Reports

  4. Operations Support Plan

  5. Optimization Report

  6. Remediation Plans as a Result of performing an infrastructure Audit and security review of the WLAN infrastructure

Answer: B,F

100% Free Download!
Download Free Demo:650-621 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass 650-621 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE