2V0-621 Latest Exam (May 2018)

[Free] 2018(June) Ensurepass VMware 2V0-621 Dumps with VCE and PDF 131-140

June 21, 2018

Ensurepass.com : Ensure you pass the IT Exams
2018 May VMware Official New Released 2V0-621
100% Free Download! 100% Pass Guaranteed!

VMware Certified Professional 6 – Data Center Virtualization Beta

Question No: 131

An administrator is assigning a user the Content Library administrator role. The user will only be creating the library for a single vCenter Server.

What is the lowest level of the permission heirarchy that this role can be granted to the user and still allow them to create a Content Library?

  1. Global

  2. Datacenter Folder

  3. Virtual Center

  4. Datacenter

Answer: A

Question No: 132

Refer to the Exhibit.

Ensurepass 2018 PDF and VCE

An administrator has created the DRS cluster shown in the Exhibit. Based on the exhibit, which statement is true?

  1. Under CPU contention, Prod-VM1 receives four times the CPU resources than Test- VM1.

  2. The Prod-VM1 will always have more CPU resources than all other virtual machines.

  3. The Test-VM2 will always have less CPU resources than all other virtual machines.

  4. Under CPU contention, Test-VM1 will receive 25% of the total CPU resources.

Answer: A

Question No: 133

What are three reasons why a virtual machine might fail to power on? (Choose three.)

  1. The virtual machine is running on an ESXi host which has an expired license.

  2. The virtual machine is running on a datastore which has insufficient disk space for the

    .vswp file.

  3. The virtual machine is in a cluster with vSphere HA Admission control enabled.

  4. The virtual machine has a disconnected network adapter.

  5. The virtual machine does not have a Virtual Hard Disk assigned.

Answer: A,B,C

Question No: 134

An administrator notices that a Windows virtual machine is using 95% CPU in Task Manager.

Which two actions should be taken to resolve this issue? (Choose two.)

  1. Increase the memory reservation of the virtual machine.

  2. Increase the CPU Shares on the resource pool where the virtual machine resides.

  3. Decrease the CPU reservation of the virtual machine.

  4. Increase the CPU limit on the resource pool where the virtual machine resides.

Answer: B,D

Question No: 135

Refer to the Exhibit.

Ensurepass 2018 PDF and VCE

An administrator receives the error message shown in the Exhibit. Which two actions can be taken to clear the warning? (Choose two.)

  1. Add a Virtual SAN datastore and configure it for High Availability heartbeating.

  2. Set the advanced High Availability parameter Das.heartbeatdsperhost to 1.

  3. Set the advanced High Availability parameter Das.ignoreInsufficientHbDatastore to true.

  4. Add a shared datastore and reconfigure High Availability.

Answer: C,D

Question No: 136

An administrator with global administrator privileges creates a custom role but fails to assign any privileges to it.

Which two privileges would the custom role have? (Choose two.)

  1. System.View

  2. System.Anonymous

  3. System.User

  4. System.ReadOnly

Answer: A,B

Question No: 137

An administrator decides to change the root password for an ESXi 6.x host to comply with the company#39;s security policies.

What are two ways that this can be accomplished? (Choose two.)

  1. Use the Direct Console User Interface to change the password.

  2. Use the passwd command in the ESXi Shell.

  3. Use the password command in the ESXi Shell.

  4. Use the vSphere client to update local users.

Answer: A,B

Question No: 138

What are two use cases for Fibre Channel Zoning in a vSphere environment? (Choose two.)

  1. Increases the number of targets presented to an ESXi host.

  2. Controls and isolates paths in a fabric.

  3. Controls and isolates paths to an NFS share.

  4. Can be used to separate different environments.

Answer: B,D

Question No: 139

After deploying a vSphere Platform Services Controller (PSC), an administrator is unable to install vCenter Server. The error displayed is:

Could not contact Lookup Service. Please check VM_ssoreg.log. Which two actions can be taken to correct this problem? (Choose two.)

  1. Verify that the clocks on the host machines running the PSC, vCenter Server, and the vSphere Web Client are synchronized.

  2. Configure a valid Identity Source for the Platform Services Controller in the vSphere Web Client.

  3. Ensure that there is no firewall blocking port 7444 between the PSC and vCenter Server.

  4. Uninstall and reinstall the Platform Services Controller software.

Answer: A,C

Question No: 140

Which two are valid Identity Sources when configuring vCenter Single Sign-On? (Choose two.)

  1. Radius

  2. NIS

  3. OpenLDAP

  4. LocalOS

Answer: C,D

100% Ensurepass Free Download!
Download Free Demo:2V0-621 Demo PDF
100% Ensurepass Free Guaranteed!
2V0-621 Dumps

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No