Question No.71

DRAG DROP

Match the business statement to its appropriate concept.

image

Correct Answer:

image

Question No.72

A customer has requested a high availability option for its data center in the event of power failure and the loss of connectivity to a virtual machine. Which three vSphere features support fault tolerance? (Choose three.)

  1. HA

  2. Virtual volume datastore

  3. vMotion

  4. Storage-based policy management

  5. DRS

  6. Virtual machine snapshots

Correct Answer: ACE

Question No.73

A developer is tasked with building an application to process shipping requests. The developer is consulting the vSphere team to determine failover options and performance best practices.

image

The development team is providing three physical ESXi hosts with 8 CPU cores and 256G8 of RAM per host.

image

The developer does NOT know how many virtual machines they will require.

Which virtual machine (VM) sizing strategy will provide the highest level of uptime, individual VM performance, and failover capacity?

  1. A few large 8 vCPU VMs per host protected by vSphere HA.

  2. Many small 1 vCPU VMs participating in an OS level clustered application protected by vSphere HA.

  3. A few large 8 vCPU VMs per host protected by vSphere Fault Tolerance.

  4. Many small l vCPU VMs participating in an OS level clustered application protected by vSphere Fault Tolerance.

Correct Answer: C

Question No.74

DRAG DROP

You have been provided with a list of requirements for a vSphere Design. For each requirement, categorize the requirement as a component of the WRT, RTO, RPO, MTD, and Recoverbility.

Drag a requirement button (R1-R8) over to the green space provided beside the corrisponding Design Phase.

image

Correct Answer:

image

Question No.75

A company would like to leverage snapshot technology on vSphere 6.5. Which configuration supports taking snapshots?

  1. Windows Failover Cluster VM with RDM in virtual mode

  2. vSphere Fault Tolerance VM

  3. Windows Failover Cluster VM with RDM in physical mode

  4. SQL Always On Availability Group

Correct Answer: A

Question No.76

A customs has requested a vSphere 6.5 deployment design where ESXi hosts are provisioned with Auto Deploy. The customer requires that certificates can be automatically refreshed and renewed from the vSphere Web Client for ESXi hosts. Which certificate policy should be configured for vCenter Server?

  1. Thumbprint Mode

  2. VMware Certificate Authority

  3. Custom Certificate Authority

  4. Subordinate Certificate Authority

Correct Answer: B

Question No.77

A company is consolidating its IT operations efforts by moving the Finance, IT, and QA departments towards a self-service environment, following SDDC best practices.

image

All departments have different priorities and expectations for uptime of the required infrastructure and applications.

image

Project stakeholders are still discussing final approvals for the budget wan the CFO.

image

To drive down the operating cost of the environment, only blade servers will implement this project.

image

image

To ensure business continuity, a colocation provider was chosen to fail over virtual machines. The implementation of the project will follow a public reference architecture provided by VMware.

What is the assumption in this scenario?

  1. The chosen architecture is sufficient.

  2. All departments demand different SLAs.

  3. Final budget approvals are being discussed.

  4. The environment will be shared by several departments.

Correct Answer: D

Question No.78

DRAG DROP

A company would like to utilize its current infrastructure but wants to adopt virtualization to consolidate its environment. Currently, the infrastructure contains:

image

image

image

server with 2 x 8 cores CPUs and 96G8 of memory backup LAN with a single physical switch production LAN

image

sufficient datastore performance as determined by the storage team Match the existing infrastructure component to its appropriate concept.

image

Correct Answer:

image

Question No.79

When considering server consolidation, plan on running vCPUs per core.

  1. 1 to 2

  2. 3 to 4

  3. 4 to 6

  4. 6 to 8

Correct Answer: A

Question No.80

Referring to the Exhibit, identify the two single points of failure in this design. (Choose two.)

image

  1. Intranet Switch

  2. Intranet Uplink

  3. Intranet vSwitch

  4. DMZ Switch

  5. DMZ Uplink

  6. DMZ vSwitch

Correct Answer: BD

>