EnsurepassQUESTION 41 Which of the following documents is designed to mitigate risk during a PureFlex installation?   A.      Site Eval B.      SSIC Listing C.      TDA Checklist D.      Power Estimator   Correct Answer: C     QUESTION 42 A customer is considering a PureFlex Express. The customer wants redundant high speed Ethernet and redundant native Fibre Channel. Read more [...]

Continue Reading

000-781 DUMPS

Latest IBM Certified Specialist 000-781 Real Exam Download 31-40

By on
EnsurepassQUESTION 31 How are the management networks of two PureFlex chassis interconnected?   A.      CMM external ports B.      Interconnect nodes C.      Front and rear flex cables D.      Top of rack InfiniBand switch   Correct Answer: A     QUESTION 32 A PureFlex technical specialist is planning a deployment of IBM PureFlex Power Compute Nodes. Which of the following Read more [...]

Continue Reading

000-781 DUMPS

Latest IBM Certified Specialist 000-781 Real Exam Download 21-30

By on
EnsurepassQUESTION 21 A Power customer running AIX asks how they will migrate their AIX environment to PureFlex. Which of the following accomplishes this task?   A.      Tivoli Storage Manager B.      Deploy a mksysb of the existing system C.      VMotion D.      BOS install from DVD   Correct Answer: B     QUESTION 22 What risk should be identified during a Pre-Sale Read more [...]

Continue Reading

000-781 DUMPS

Latest IBM Certified Specialist 000-781 Real Exam Download 11-20

By on
EnsurepassQUESTION 11 A prospect is interested in a PureFlex and must have storage network redundancy using Fibre Channel. The customer needs one switch bay open for future use. Which is the minimum PureFlex offering that meets these requirements?   A.      Express B.      Standard C.      Enterprise D.      Application   Correct Answer: B     QUESTION 12 A PureFlex Read more [...]

Continue Reading

000-781 DUMPS

Latest IBM Certified Specialist 000-781 Real Exam Download 1-10

By on
EnsurepassQUESTION 1 Power Systems compute nodes communicate over the management network through which controller?   A.      Flexible Service Processor (FSP) B.      Integrated Virtualization Management (IVM) C.      Integrated Management Module v1 (IMMv1) D.      Integrated Management Module v2 (IMMv2)   Correct Answer: A     QUESTION 2 A customer is moving their IBM Read more [...]